Please join us as Duane L. Kenagy, Interim Deputy Executive Director, Port of Long Beach, updates us on the Gerald Desmond Bridge Replacement Project. As we all know, the bridge is a major commuter corridor, but built in the 1960's, was not designed to handle today's traffic volumes. This replacement project will not only ensure the safety of commuters and truck drivers but will also support about 3,000 jobs.
Thursday Oct 19, 2017
11:30 AM - 1:00 PM PDT
11:30 Registration, Networking; 12:00—1:00 Program
Long Beach Airport Marriott
4700 Airport Plaza Drive, Long Beach, CA 90815
Cost: Chamber Members: $45 | Nonmembers: $55 |
Table of 10: $500
Judy Nelson jnelson@lbchamber.com
Send Email
Printed courtesy of www.lbchamber.com – Contact the Long Beach Area Chamber of Commerce for more information.
One World Trade Center, Suite 101, Long Beach , CA 90831 – (562) 436-1251 – info@lbchamber.com